Campus devices and equipment

Campus Server Equipment

Required local equipment, network and protected power for the college's selected software and prepared campus workflows.

What it is

The local computing equipment your college needs for its selected software. Together with a working campus network and protected power, it supports prepared workflows when the internet connection is unavailable.

Attendance, examination checking, library counters, fee-counter records, hostel movement and meal counts each have their own readiness conditions. Capacity is based on the services and student numbers agreed for the installation.

Equipment room
Provide a clean, ventilated space with controlled access.
Protected power
A suitable UPS is required. Include its data cable in the procurement specification.
Campus network
Provide reliable connections to the working areas and selected equipment.
Broadband
Ordinary broadband is supported; a leased line or static IP is not required.

Buy through your normal procurement

CampusKendra provides a written specification and checks compatibility. Your college orders and pays suppliers directly, owns the equipment and records it under its normal capital procurement process.

The software charge includes configuration, installation and agreed commissioning. There is no separate CampusKendra hardware-handling fee. Cloud, connectivity and other provider bills remain direct college expenses.

Before you order

Confirm student numbers, selected services and expected working locations. Review the equipment room, network coverage, power protection and backup arrangements before approving a supplier model.

Before handover, test the selected local tasks with the internet disconnected. Restore the connection and check pending records. Keep normal safety controls active throughout.

Name the college contacts responsible for the room, network and power. Equipment ownership includes arranging physical upkeep and supplier support, while CampusKendra provides standard support for the agreed software scope.

From installation to daily use

How your college uses it

Prepare the college’s working environment for the selected software. The procurement decision should cover daily locations, power, network, upkeep and recovery.

  1. List the work and places to support

    Identify classrooms, office desks, library counters, examination halls and selected facilities. Agree student numbers and the expected workload so procurement is based on the college’s actual scope.

  2. Check the campus before ordering

    Review a clean, ventilated equipment space with controlled access. Check protected power, network coverage and the physical work needed to reach the agreed locations. Assess suitable existing equipment before buying replacements.

  3. Purchase and prepare the agreed equipment

    Your college orders through its normal procurement process and owns the equipment. It also arranges connectivity and relevant provider accounts. CampusKendra installs and configures the agreed software once these requirements are ready.

  4. Test daily work and recovery

    Staff complete representative tasks on the actual installation. Test the selected prepared workflows with internet disconnected, then reconnect and check pending records. Review backup and recovery arrangements with named contacts before handover.

What your team can review

Checks and records to keep

Agreed scope and specification
The written schedule identifies required equipment and working locations without treating all peripheral devices as compulsory.
Acceptance and training
Staff confirm the imported records, permissions, chosen tasks and prepared outage checks. Open issues need clear responsibility.
Ownership and support contacts
Keep software support, physical upkeep, supplier warranties, connectivity and backup responsibilities clear in the handover.
Details that help you decide

Common questions

Does buying this equipment activate all software?

No. Select the software plan and additions separately. The equipment must support the agreed services and capacity.

Does an internet-outage claim cover power or hardware failure?

No. Prepared local work still needs healthy campus equipment, power, network and valid sessions. Agree the alternative routine and recovery checks for a local failure.

Who pays for maintenance and running costs?

Your college pays equipment, physical works, connectivity and provider bills directly. Standard software support follows the software agreement. Supplier repair, physical upkeep and any later custom work have their own responsibilities.

Before you decide

An internet outage is different from a local equipment failure.

Prepared campus workflows can continue only while the required local equipment, power, network, services and valid sessions remain healthy. New sign-in, remote views, online payment confirmation and external messages need connectivity.

Pump protection uses independent local safety controls; it must not depend on a campus server alone. Agree the outage and recovery checks for each selected workflow before acceptance.

Equipment in everyday use

The foundation for your selected solutions

Explore all solutions
Plan it around your campus

Confirm compatibility before you buy.

Share your selected services and existing equipment. We’ll confirm software requirements, the procurement specification and the installation checks for your campus.