Meters, tank sensors and pump monitoring selected through a site survey for the college's electricity and water systems.

What it is

Electricity meters, tank-level sensors and pump monitoring collect readings at the points agreed for your campus. A collection unit brings those readings into the selected monitoring software.

Electricity meters
Measure selected main circuits and large loads.
Tank sensors
Report levels at the rooftop and ground tanks in scope.
Pump monitoring
Support the specified protective controls and operating checks.
Collection equipment
Gather readings from the installed monitoring points.

Choose useful measuring points

For planning, consider 10 to 15 meters and 3 to 5 tanks as survey starting points. Actual quantities depend on buildings, large loads, tank arrangements and cable routes. The site survey confirms the equipment list.

Choose measuring points that help facilities staff find and check problems. A meter on every circuit is not automatically a better installation. Agree who reviews the information and which decisions it supports.

Before you order

A site visit is required before equipment quotation. Your qualified electrical contractor plans conduit, cable, mounting and the shutdown needed for safe installation. Schedule the work around campus operations.

During commissioning, qualified staff check each meter against a reference measurement, circuit by circuit. They safely verify the specified pump-protection functions and the authorised local controls without bypassing protective interlocks.

Your college orders equipment and physical work directly. CampusKendra provides the written compatibility requirements, software integration and commissioning within the agreed software scope. Models, quantities and supplier prices are settled through procurement after the survey.

From installation to daily use

How your college uses it

Buy equipment for agreed measuring points after a site survey. Useful readings depend on correct placement, calibration and qualified commissioning.

  1. Select useful measuring points

    Start with important electrical loads, tanks and pumps. Link each point to a practical question such as after-hours consumption, tank level or pump condition. A higher device count is not automatically a better installation.

  2. Confirm the installation specification

    The survey checks site conditions, existing equipment, access, mounting and physical routes. Qualified contractors plan the safe work and required shutdown around college operations.

  3. Verify each point before handover

    Qualified staff compare meter readings with an appropriate reference and check tank calibration. They safely test the specified pump protection. Clear labels connect each reading to the correct circuit, tank or pump.

  4. Establish the baseline and upkeep routine

    Record 60 to 90 days of representative readings before estimating savings. Check reading age and quality during use. Plan equipment maintenance and investigation of faulty or implausible measurements.

What your team can review

Checks and records to keep

Survey and equipment schedule
Keep the measuring point, equipment model, quantity and physical work clear before placing supplier orders.
Commissioning checks
The handover should identify verified readings, labels and safe protection checks for the installed equipment.
Baseline and maintenance
Dated readings and operating conditions support a fair comparison. Supplier support and maintenance responsibilities remain with the agreed contacts.
Details that help you decide

Common questions

Can we choose equipment before the site visit?

Use the survey to settle the final models, quantities and physical work. Compatibility and site conditions must be checked before a supplier order.

Does software replace pump safety equipment?

No. Independent local protection is required. Qualified staff commission and maintain it; protective operation must not rely on internet access.

Will the installation guarantee savings?

No. Measured savings require a suitable baseline and comparable conditions. Equipment records consumption and operating conditions so staff can investigate and act.

Before you decide

Measure the campus before estimating savings.

A savings estimate needs 60 to 90 days of readings from the college's own site, with efficiency automation inactive during the baseline. Existing safety protection remains active.

Pump protection uses independent local safety controls. It can remain available during an internet outage with healthy local power and equipment; remote alert delivery needs connectivity. Authorised local control must remain within the equipment's safety limits.

Equipment in everyday use

Solutions that use this equipment

Explore all solutions
Plan it around your campus

Confirm compatibility before you buy.

Share your selected services and existing equipment. We’ll confirm software requirements, the procurement specification and the installation checks for your campus.